How Long Does It Take to Get New Windows and Doors? Current Lead Times in Ontario

If you're planning to replace your windows or doors, one of the first questions you'll probably have is:
How long will it take from the time I place my order until everything is installed?
At Tricity Windows & Doors, our current lead times are approximately 4–5 weeks for replacement windows and patio doors, about 6 weeks for white entry doors, and approximately 8 weeks for painted or stained entry doors.
But there is more to the timeline than manufacturing. Final measurements need to be completed, your products are custom ordered for your home, and installation needs to be scheduled.
Here is what homeowners in Kitchener, Waterloo, Cambridge, Guelph, Hamilton and surrounding areas can currently expect.

What Are Tricity Windows & Doors' Current Lead Times?
As of 2026, our typical lead times are:
Product | Current Approximate Lead Time |
Replacement windows | 4–5 weeks |
Patio doors | 4–5 weeks |
White entry doors | Around 6 weeks |
Painted or stained entry doors | Around 8 weeks |
These are typical current lead times and not guaranteed delivery dates. Manufacturing schedules, product specifications, custom options and other circumstances can occasionally affect an individual order.
At the moment, however, our lead times have been relatively stable.
How Long Does It Take to Get Replacement Windows After Ordering?
For most Tricity window projects, homeowners can currently expect approximately 4–5 weeks of manufacturing lead time after final measurements and order confirmation.
Replacement windows are not simply taken from a warehouse shelf.
Each opening is measured and the windows are manufactured according to the specifications of that particular project. Size, operating style, glass configuration, colour, grills and other options are confirmed before the order goes into production.
That is why there is normally a period of several weeks between ordering replacement windows and installing them.
When Are the Final Window Measurements Taken?
Once a homeowner decides to proceed with Tricity Windows & Doors, final measurements are normally completed within approximately two weeks.
The final measurement is an important part of the process.
The initial measurements taken during the sales consultation allow us to prepare the quotation and determine the project's specifications. Before manufacturing, an installer completes the final measurements and reviews important installation details.
This additional step helps make sure the products being manufactured match the actual openings and the planned installation method.
How Long From Signing a Window Contract to Installation?
This is slightly different from asking about manufacturing lead time.
For example, if final measurements are completed within approximately two weeks and the current window production time is approximately 4–5 weeks, homeowners should not assume that signing a contract means their windows will necessarily be installed exactly four or five weeks later.
A typical project includes:
Contract and deposit → Final measurements → Order confirmation → Manufacturing → Installation scheduling → Installation
If you have a particular deadline in mind, such as a renovation, move-in date, vacation or a time of year when you would prefer the installation completed, tell us during your consultation.
We can explain the current production schedule and help you plan accordingly.
How Long Does It Take to Get a Patio Door?
Our current lead time for most patio doors is approximately 4–5 weeks.
Like replacement windows, patio doors are ordered according to the specifications of the opening and the options selected by the homeowner.
Certain configurations or specialty options may affect production time, so your specific project timeline will be discussed when your order is finalized.
How Long Does It Take to Get a New Front Door?
Entry doors generally take a little longer than windows.
At Tricity Windows & Doors, the current approximate lead times are:
White entry doors: around 6 weeks
Painted or stained entry doors: around 8 weeks
Why the difference?
A painted or stained entry door requires additional finishing and production steps. The design of the door, glass, sidelites, hardware, finish and other custom options can also influence manufacturing time.
If you're replacing your front door for a particular deadline, it is a good idea to start planning earlier than you would for a standard window project.
How Long Does Window Installation Take?
Manufacturing time and installation time are two very different things.
Once your windows and doors are ready, the actual installation may take anywhere from a few hours to a few days, depending on the project.
Some of the factors that affect installation time include:
Number of windows and doors being replaced
Size and type of the products
Full-frame versus retrofit installation
Bay, bow or shaped windows
Patio and entry doors
Accessibility of the openings
Structural modifications or new openings
Condition of the existing openings
Complexity of the interior and exterior finishing
A smaller, straightforward replacement may be completed within a few hours, while a large whole-house replacement or a more complex project can require several days.
We review the expected installation time with the homeowner when the project is scheduled.
How Long Does It Take to Replace All the Windows in a House?
There isn't one accurate answer for every house.
The number of windows matters, but the complexity of the installation matters just as much.
Replacing ten straightforward windows is very different from a project involving a bay window, large combinations, entry doors, structural modifications or difficult-to-access openings.
For this reason, we prefer to provide an installation estimate based on the actual project rather than promise that every whole-house window replacement can be completed in one day.
Yes. Tricity Windows & Doors installs replacement windows and doors throughout the winter, weather permitting.
Ontario homeowners do not necessarily need to wait until spring to replace their windows.
There are, however, weather conditions when postponing an installation is the responsible choice.
Will You Install Windows When It Is Snowing or Raining?
Not always.
We may postpone an installation during heavy rain or heavy snow.
During a window or door replacement, the existing product has to be removed and the rough opening and framing can temporarily be exposed to the exterior.
Installing during heavy rain or snow could unnecessarily expose the opening and studs to moisture.
We may also postpone an installation when snow, ice or other conditions make exterior work slippery or unsafe for our installation crew.
A short weather delay is preferable to risking water exposure to the structure or asking installers to work in unsafe conditions.
Is It Better to Replace Windows in Spring or Summer?
Not necessarily.
Windows can be replaced throughout the year in Ontario, and waiting for warm weather isn't automatically required.
Winter installation can be perfectly suitable when weather conditions allow the work to be performed safely and the opening can be properly protected.
Rather than choosing a season based only on temperature, consider when you actually need the windows replaced and work backward from there.
If your existing windows are drafty, leaking, difficult to operate or experiencing other problems, waiting several additional months simply because it is winter may not be necessary.
When Should I Order Windows If I Want Them Installed Before Winter?
Don't wait until the first cold week to start the process.
Remember that the manufacturing lead time is only one part of the timeline.
You also need to allow time for your consultation, product selections, contract, final measurements, manufacturing and installation scheduling.
With current Tricity window lead times of approximately 4–5 weeks after final measurements, planning ahead gives you more flexibility when choosing your installation period.
The same applies if you want your windows completed before a vacation, renovation, move or other important date.
What Can Delay a Window or Door Installation?
Although our current production times have been relatively stable, some projects can take longer.
Possible factors include custom products or finishes, specialty configurations, manufacturing changes, unusually complex projects and severe weather around the scheduled installation date.
Entry doors with painted or stained finishes also naturally require more production time than standard white doors.
We would rather give homeowners a realistic estimate than promise an installation date before all the details of the project are known.
Frequently Asked Questions About Window and Door Lead Times
How long does it take to order replacement windows in Ontario?
At Tricity Windows & Doors, our current manufacturing lead time for most replacement windows is approximately 4–5 weeks after final measurements and order confirmation.
How long does it take to get windows installed after signing a contract?
Final measurements are normally completed within approximately two weeks after the homeowner decides to proceed. The windows then currently require approximately 4–5 weeks for manufacturing, followed by installation scheduling.
How long does a patio door take to order?
Our current typical lead time for patio doors is approximately 4–5 weeks.
How long does a new front door take?
Current Tricity lead times are approximately 6 weeks for white entry doors and approximately 8 weeks for painted or stained entry doors.
How long does the actual window installation take?
Installation can range from a few hours to several days, depending on the number of windows and doors, installation method and complexity of the project.
Can windows be replaced during winter?
Yes. Tricity installs windows and doors throughout the winter when weather conditions allow the work to be completed properly and safely.
Can windows be installed in the rain?
Light weather conditions may not necessarily prevent installation, but we do not want to expose an open wall or structural framing to heavy rain or snow. Installation may therefore be rescheduled during severe precipitation.
Do you install windows when there is snow outside?
Yes, winter installation is possible. However, installation may be postponed during heavy snowfall or when snow and ice create unsafe, slippery working conditions.
Planning a Window or Door Replacement in Kitchener-Waterloo?
If you're considering replacing windows, a patio door, garden door or an entry door, you don't have to wait until you're ready for installation to start planning.
Knowing the current manufacturing timeline can help you decide when to begin the process.
Contact Tricity Windows & Doors for a consultation and the most current lead time for your specific project.